TPI Curing Speed
Silicate-based concrete curing compound
DESCRIBE
TPI CURING S It is a ready-to-use, pre-mixed metal silicate solution. When applied to fresh concrete, the product forms a thin, microcrystalline film that seals pores, reducing water evaporation. This allows for complete cement hydration. TPI CURING S It does not contain chloride.
SCOPE OF USE
- TPI CURING S Treatment for vertical surfaces will be necessary for subsequent application steps. Areas where resin-based curing membranes are unsuitable due to the unclear degradation of the membrane layer will affect the performance of subsequent treatment steps.
- Construction is possible. TPI CURING S Applying it to "fresh" concrete increases the density of the cured concrete and therefore increases its strength.
ADVANTAGES OF TPI CURING S
- It helps concrete achieve maximum hydration, strength, durability, and surface hardness.
- Becoming part of the surface, it aids in long-term maintenance and has dust-repellent properties.
- Non-flammable and suitable for locations where solvent-based treatment systems are not feasible.
- Reduced shrinkage is accompanied by a reduction in hairline cracks and fissures on vertical and horizontal surfaces.
- When used correctly, it will not impair the adhesion between the concrete surface and subsequent construction steps.
- Light walking on the surface is permitted after 24 hours.
SPECIFICATIONS
| Target | Parameter |
| Origin | Sodium silicate |
| Type / Color | Liquid/blue |
| Density | 1.13 ± 0.05 kg/liter |
| Standard | 4 – 5 m2/liter
It depends on the wind, humidity, and temperature. |
| Specifications | 5-liter / 25-liter / 200-liter containers |
| Expiry | 12 months |
| Storage | A cool, dry, shady place. |
TPI Curing Installation Guide
Regarding the vertical aspect:
After removing the formwork, evenly moisten the entire concrete with clean water. Allow the concrete surface to dry before application. TPI CURING S Apply using a conventional spray device or brush (spraying is recommended for complete surface coverage). Ensure the entire surface is completely covered.
For horizontal surfaces:
Construction TPI CURING S Use a spray device immediately after leveling the surface, once all surface water has evaporated. Ensure that no water remains on the surface and under no circumstances should less than the recommended dosage be used. For optimal system performance, application should be as soon as possible when the concrete is ready for curing.
For all surfaces:
If the concrete is exposed to direct sunlight and high temperatures (above 23°F).oC) or in areas with harsh, dry winds. The surface should be protected by covering it with PE plastic sheeting within 2-3 hours after application. TPI CURING S To allow the crystalline film time to form, the PE coating should be in direct contact with the surface for optimal effectiveness.
Toilet:
Ensure that the equipment is thoroughly rinsed with clean water.
Construction Notes/TPI Curing S Limits:
The product is supplied in a ready-to-use form and should not be diluted.


Reviews
There are no reviews yet.