Long Thanh, Dong Nai
The Long Thanh International Airport construction project has a total investment of over VND 336,630 billion (over USD 16 billion), divided into three construction phases. Phase 1, covering an area of over 2,500 hectares, has an investment value of VND 114,450 billion (USD 5.45 billion) and includes one runway (package 5.10), a passenger terminal (package 4.6), and supporting facilities (connecting roads, air traffic control tower, etc.) with a capacity of 25 million passengers per year. Phase 1 is expected to be operational in 2026.